  • Roof waterproof case of a tourist factory+

    【Construction time】2020/09
    【Construction site】Chiayi City
    【Construction area】About 100 square meters
    【Construction Video】〔YouTube〕

        https://youtu.be/SYVxSdsZYgo


    (1) Before construction


    (2) Waterproof cement mortar construction preparation


    (3) Waterproof powder mixed with cement sand




    (4) After construction


    (5) Waterproof test on the second day of construction


  • The new concept of complete body waterproofing+

    The new concept of complete body waterproofing

    Generally, everyone is most familiar with the commonly used waterproof blanket or Epoxy construction method. For some corners, mechanical stands, as well as the interface of different building materials, etc., because it is not easy to close the edges, it is particularly prone to waterproof loopholes. and rip!
    If we put the cement mortar mixed with our Black King Kong waterproof powder on the bottom layer (1~3 cm) first, those edges and corners will be waterproofing at the same time!
    The cost of our waterproof powder is only about US$2 per square meter (construction with 1cm thickness) ~ US$6 (construction with 3cm thickness) (traditional Epoxy construction method costs US $25~50 per square meter).

    You can also consider using two construction methods together, multiple waterproof protections!